TRELLEBORG’S engineered products operation has successfully completed its supply of floatover equipment for the PETRONAS NC3 gas field, located in Block SK316, 200 km north of Bintulu, Sarawak in Malaysia.

The company provided PAPE Engineering, an engineering company responsible for the transportation and installation of the platform jacket and topside, with four Leg Mating Units (LMUs), as well as four sway fenders, four loadout pads and four deck support units (DSU).

Performed at the fabrication yard prior to the floatover process, the LMU installation provided PAPE with assured and risk-free performance before the floatover operation commenced.