Wheatstone Project Overview – October 2017
Related articles
Trelleborg contributes to topside floatover for the world’s largest FPSO Spar Platform
Floatover equipment from Trelleborg’s engineered products operation has contributed to the successful mating of Statoil’s landmark Aasta Hansteen gas field project’s 24,000 ton topside and the world’s largest Spar FPSO
North Sea giant Johan Sverdrup is now on stream
EQUINOR and the Johan Sverdrup partnership consisting of Lundin Norway, Petoro, Aker BP and Total, started production from the giant field in the North Sea, more than two months ahead
Life onboard the Prelude FLNG facility
This is a short film about the Prelude FLNG facilty located off the North West coast of Australia. The vision Shell had for Prelude is now a reality. Thank you
A Proud Moment for Jumbo!
To celebrate Jumbo’s 50 Year Anniversary, they take a look back at the story so far. From their beginnings as pioneers swimming against the tide to 50 years later, still
New Module for Troll C
The Troll C platform on the Norwegian Continental Shelf has a new skyline! ?? A new module of some 400-tonnes will receive more gas from the subsea field Fram close
Norway’s longest oil pipeline in place
Late last week the last pipe of what is now Norway’s longest and largest oil pipeline was installed right next to the riser platform at the Johan Sverdrup field. The